Works

Accomplished Works

Toxicological Laboratory

Civil works in Santana de Parnaíba with 3,650.05 m² of total area.

Works
obras - 1
obras - 2
obras - 3
obras - 4
obras - 5
obras - 6
obras - 7
obras - 8
obras - 9
obras - 10
obras - 11
obras - 12

Clique nas imagens para ampliar.

Trifil

Effluent Treatment Plant

Works

Ultragaz

Paving in reinforced concrete and interlocking floor

Works

Merck Sharp & Dohme

Civil works for implementation of chillers and boilers for factory.

Reform of WFI in internal area.

Installation of Pipe rack, Chillers and Steam generator.

Works

Weg

Structural restoration

Facade

Works

Petrobras – Rsps - Edisp

Implementation of the Telepresence Room

Construction of the Butler´s Pantry

Expansion of the Council Hall

Construction of special furniture

Implementation of structured cabling, telephone cabling, the power system and grounding

Implementation of the changing room.

Works

Mrs

Strengthening of Metallic structure of the Terminal Warehouse MRS Itaquaquecetuba

Works

Execution of metallic structure, sheet metal, gutters and conductors in a warehouse of 15.000 m².

Sgd

Structural reinforcement for machines’support

Works

L'oreal

Several Reforms in the factory

Reform of the kitchen and dining hall

Structural Restoration and Waterproofing of the Overhead Water Tanks

Civil works for the implementation of the packaging sector

Works

Pepsico

Building reform to lab facility.

Works

Abbott

Laboratory implementation of Sto. Amaro unit. Civil, electrical and hydraulic.

Boehringer Ingelheim

Reform of laboratory building - electrical and hydraulic systems.

Implementation of:

  • Warehouse
  • Packaging sector
  • Personal Protective Equipment area
  • Generators room
  • Corrosive room
  • Installation of air conditioning and air renewal in the offices

Saint-gobain Vidros

  • Reform of Oven #14 Cover
  • Area: 4.000 m²
  • Construction of the canvassing stall design, construction and installation of metallic structure coverings
  • Dacarto

  • Construction of the Contention Basin
  • Construction of the Silo Base
  • Expansion of the substation power
  • Construction of the buried channel
  • Sgd Brasil

    Construction of the Decoration Building

    Area: 1.500 m²

    Delphi

    Adaptation of the Expedition Hall

    Osram

    Recovery and Painting of Facades

    Impermeabilization of the concrete slab covering

    Structural recovery of the pluvial water gallery

    Construction of the rigid pavement in reinforced concrete

    Saint-gobain Abrasivos

    Construction of the Metallic Platform

    Pandurata (Bauducco)

    Construction of Base for two silos

    Load: 280 tons

    Quartzolit

  • Construction of the Maintenance Building
  • Area: 940 m²
  • Ultrafértil

  • Construction of the Laboratory Building
  • Area: 500 m²
  • Av. Bernardo Geisel Filho, S/Nº - Cubatão - SP